Skip to content
ivisionAI

CASE STUDIES

An end-to-end ERP that cut food waste by 30%

A grocery chain was losing margin to three things at once: shifts that didn't match demand, supply delays, and fresh stock expiring on the shelf. We built one ERP that treats them as the same forecasting problem.

Industry: Retail
An end-to-end ERP that cut food waste by 30%

About the client

A multi-site grocery retail chain running fresh and ambient ranges across a distribution network, with per-store variation in assortment and footfall.

The challenge

Grocery margin is thin enough that operational sloppiness shows up directly in the P&L, and this chain was leaking in three places simultaneously.

Staff rotas were built in spreadsheets that had never seen a sales forecast, producing overstaffed quiet days and understaffed peaks. Supply ran on standing orders adjusted by instinct, so deliveries arrived late or arrived wrong. And fresh stock was written off in volume because re-ordering reflected last month's assumptions rather than this week's actual sell-through.

Each site could see its own numbers, more or less. Nobody could see the network — which meant stock sat in one store while another ran out of the same item.

The solution

The three problems shared a root: no single demand signal. Discovery treated them as one system rather than three projects, which is why the result is an ERP rather than a re-ordering tool bolted onto a rota tool.

We built the data layer first, unifying sales, stock and supplier data across the network into one schema, then put the predictive modules on top of it.

  • Predictive re-ordering — order proposals generated from real sell-through, seasonality and known local events, with a human approving rather than calculating.
  • Demand-led shift planning — rotas built against the same forecast that drives purchasing, with labour cost per shift visible while planning rather than after payroll.
  • Network-wide live inventory, making inter-store transfers possible early enough to prevent both a stockout and a write-off.
  • Supplier performance tracking — lead-time reliability measured automatically and fed back into ordering, so chronic under-deliverers stop being planned around optimistically.

What changed

Waste fell substantially, and the chain gained a view of its own network it had never had. Buying decisions moved from instinct to evidence, and the same forecast now drives both what gets ordered and who is rostered to sell it.

The takeaway

Waste, staffing and supply look like three departments' problems, so they usually get three separate tools. They are one forecasting problem wearing three uniforms — and solving them together is why the numbers moved.

NEXT STEP

See what this looks like for your business.

A 30-minute call, a map of your processes, and a straight answer on what a tailor-made system would cost you. No deck, no pressure.

OPERATIONS

  • Operations: Global Remote
  • European Hubs: Tirana / Cologne
  • SLA: Reply < 24 Hours